PROJECT TITLE: CADANGAN PINDAAN KEPADA PELAN KELULUSAN NO. BP S1 OSC 2011 2715 BERTARIKH 9 DEC 2011 BAGI BLOCK C DARIPADA 1 BLOK BANGUNAN PEJABAT 7 TINGKAT BERSERTA 1 TINGKAT RUANG M & E, 1 TINGKAT BAWAH RENDAH DAN 3 TINGKAT BESMEN TEMPAT LETAK KERETAKEPADA:3 BLOK 35 TINGKAT PANSAPURI SERVIS (1388 UNIT) DENGAN 1 TINGKAT M & E, 1 ARAS KEMUDAHAN PENDUDUK, 11 UNIT KEDAI BERSERTA 5 TINGKAT SEPARA BASEMEN DAN 2 TINGKAT BASEMEN TEMPAT LETAK KERETA DI ATAS LOT-LOT 2276, 2277, 2246, 1456, 3678 DAN PT 8989, LEBUHRAYA PERSEKUTUAN / PERSIMPANGAN TAMAN DESA, KUALA LUMPUR.UNTUK: TETUAN SERI TIARA DEVELOPMENT SDN. BHD.
Foundation Sub Con - Geopancar Sdn. Bhd.
Scope of Land Surveying works - Setting out Bored piles points & Diaphragm wall
PROJECT TITLE: CADANGAN PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI : 1. 2 TINGKAT BESMEN TEMPAT LETAK KERETA 2. BLOK A - 12 UNIT KEDAI DI TINGKAT BAWAH HINGGA TINGKAT 3 3. BLOK B - 12 UNIT KEDAI DI TINGKAT BAWAH HINGGA TINGKAT 3 4. BLOK C - 7 UNIT KEDAI DI TINGKAT BAWAH HINGGA TINGKAT 2 DAN 189 UNIT SOHO DI TINGKAT 3 HINGGA TINGKAT 23 DENGAN KEMUDAHAN AWAM DAN SURAU DI ARAS BUMBUNG 5. BLOK D - 2 UNIT KEDAI DI TINGKAT BAWAH DAN TINGKAT 1 SERTA 1 UNIT RESTORAN DI TINGKAT 2 DAN 121 BILIK HOTEL SUITE DI TINGKAT BAWAH HINGGA TINGKAT 24 DI ATAS LOT 25670 - 25686 & 2346 BANDAR SELAYANG, MUKIM BATU, DAERAH GOMBAK, MAJLIS PERBANDARAN SELAYANG, SELANGOR D. EHSAN.UNTUK : ENGTEX EMERALD SDN. BHD.
Main Contractor - Inta Bina Sdn. Bhd.
Project Manager: Mr. Ling T. H.
Foundation Sub Con - Aneka Jaringan Sdn. Bhd.
Project Manager: Mr. Teh
Scope of Land Surveying works - Setting out Diaphragm walls, pile cap, grid line for structural works.
PROJECT TITLE: CADANGAN PEMBANGUNAN 1 BLOK BANGUNAN HOTEL 30 TINGKAT (640 BILIK) TERMASUK 8 TINGKAT TEMPAT LETAK KERETA DI TINGKAT 1 HINGGA 8 DENGAN 2 ARAS BESMEN TEMPAT LETAK KERETA DI ATAS PT 66 (DAHULUNYA LOT 72, 76, 77 & 78), SEKSYEN 43, JALAN YAP KWAN SENG, KUALA LUMPUR WILAYAH PERSEKUTUANUNTUK: TETUAN WINBOND PROPOERTIES SDN. BHD.
Foundation Sub Con - Geopancar Sdn. Bhd.
Project Manager: Mr. S. S. Cheng
Scope of Land Surveying works - Setting out Bored piles points & Diaphragm wall
PROJECT TITLE: CADANGAN MEROBOH DAN MEMBINA SEMULA SEBUAH HOTEL BAJET 8 TINGKAT (150 BILIK) BESERTA TINGKAT BAWAH TANAH (UNTUK LETAK KERETA) DI ATAS LOT-LOT 819, 820, 821 & 822, JALAN PUTRA, DAERAH KUALA LUMPUR, BANDAR KUALA LUMPUR, WILAYAH PERSEKUTUAN.UNTUK: Tetuan K P ECO CITY SDN BHD.
Main Contractor - Horizon Rise Builders Sdn. Bhd.
Project Manager: Ir. R. Thevathas (Das)
Foundation Sub Con - Geodata Engineering Sdn. Bhd.
Director: Mr. Stanley Chai
Scope of Land Surveying works - Setting out micro piles points & Grid line for construct stuctural.