Monday, 15 October 2012

Desa Pandan (Project commence on Sept 2011)

PROJECT TITLE: CADANGAN PEMBANGUNAN YANG MENGANDUNGI: FASA 1 2 BLOK PANGSAPURI SERVIS 23 TINGKAT (474 UNIT) YANG MENGANDUNGI 3 TINGKAT PODIUM TEMPAT LETAK KERETA, 2 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH, KEMUDAHAN PENDUDUK DAN KOLAM RENANG. FASA 2 1 BLOK KEDAI 2 TINGKAT DI ATAS LOT PT. 1865, JALAN DESA PANDAN, MUKIM AMPANG, BANDAR KUALA LUMPUR.UNTUK TENTUAN OPT VENTURES SDN. BHD.


Foundation Sub Con - Geopancar Sdn. Bhd.

Scope of Land Surveying works - Setting out Bored piles points.



Public Mutual at Jalan Tengah (Project commence 2011)

PROJECT TITLE: CADANGAN PEMBANGUNAN 1 BLOK PEJABAT 40 TINGIKAT TERMASUK 4 TINGKAT PODIUM PERDAGANGAN DENGAN 6 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH DI ATAS LOT 59, SEK 57, JALAN RAJA CHULAN, KUALA LUMPURUNTUK TENTUAN PUBLIC HOLDINGS SDN BHD



Foundation Sub Con - Geopancar Sdn. Bhd. & Econpile Sdn. Bhd.
Project Manager: Mr. S. S. Cheng


Scope of Land Surveying works - Setting out Diaphragm wall, Barrete Piles & Bored Piles.





MASS RAPID TRANSIT (MRT) MALAYSIA Package V7 (Project commence Sept 2012)

PROJECT TITLE: PROJECT MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH - KAJANG. PACKAGE V7: CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM BANDAR TUN HUSSEIN ONN TO TAMAN MESRA.



Foundation Sub Con - Geopancar Sdn. Bhd.

Scope of Land Surveying works - Setting out Bored piles points.




Friday, 12 October 2012

Sri Damansara Budget Hotel (Project Commence June 2012)

PROJECT TITLE: CADANGAN MEMBINA SEBUAH BANGUNAN HOTEL 15 TINGKAT YANG MENGADUNGI:  a) 12 TINGKAT - 153 BILIK HOTEL.  b) 3 TINGKAT - RUMAH KELAB, RUANG PAMERAN & RESTORAN.  c) 2 1/2 TINGKAT - TEMPAT LETAK KERETA ARAS BAWAH TANAH (B1~B) DI ATAS LOT 37186 (P.T 21537), JALAN CEMPAKA SD 12/5, BANDAR SRI DAMANSARA, DAERAH PETALING, SELANGOR DARUL EHSANUNTUK ENGTEX PROPERTIES SDN. BHD.


Foundation Sub Con - Aneka Jaringan Sdn. Bhd.
Project Manager: Mr. Teh

Scope of Land Surveying works - Setting out Diaphragm wall & Bored piles.





Kota Damansara Bungalow (Project commence 2010)

PROJECT TITLE: CADANGAN MEMBINA 23 UNIT RUMAH SESEBUAH YANG MENGADUNGI:  a) 10 UNIT RUMAH SESEBUAH 3 TINGKAT (JENIS A) DI ATAS LOT P.T 11265-11267 & 11271-11277.  b) 1 UNIT RUMAH SESEBUAH 3 TINGKAT (JENIS A1) DI ATAS LOT P.T 11268.  c) 2 UNIT RUMAH SESEBUAH  TINGKAT (JENIS A2) DI ATAS LOT P.T 11269-11270.  d)  9 UNIT RUMAH SESEBUAH 3 TINGKAT (JENIS B) DI ATAS LOT P.T 11256-11264.  e) 1 UNIT RUMAH SESEBUAH 3 TINGKAT (JENIS B1) DI ATAS LOT P.T 11255.  f)  1 UNIT PONDOK PENGAWAL JALAN KENYANG 11/4, SEKSYEN 11, KOTA DAMANSARA, PEKAN BARU SUNGAI BULOH, DAERAH PETALING, SELANGOR DARUL EHSAN.UNTUK TENTUAN  BONUS FOCUS (M) SDN. BHD.


Main Contractor - Maxprom Bina Sdn. Bhd.
Project Manager: Mr. K.K. Chan

Foundation Sub Con - Geodata Engineering Sdn. Bhd.
Director: Mr. Stanley Chai


Scope of Land Surveying works - Setting out Micropiles, Retaining wall, Building grid line, and Boundary.







KL Sentral - Lot D (Project commence September 2011)

PROJECT TITLE: CADANGAN PEMBANGUNAN 2 BLOK PANGSAPURI SERVIS MEWAH 7 TINGKAT (7 UNITS) BESERTA 5 TINGKAT TEMPAT LETAK KERETA PARAS BAWAH DAN KEMUDAHAN-KEMUDAHAN AWAM DI ATAS LOT 72 (LOT D), SEKSYEN 70, JALAN DAMANSARA DALAM BANDARAYA KUALA LUMPUR.   UNTUK TENTUAN KUALA LUMPUR SENTRAL


Foundation Contractor - Aneka Jaringan Sdn. Bhd.
Genaral Manager: Mr. Ooi Chong Ping

Scope of Land Surveying works - Setting out Bored pile, CBP, Strutting and Steel Decking



Thursday, 11 October 2012

Mid Valley Citi Development - Parcel 3 (Project commence March 2012)

PROJECT TITLE: CADANGAN PEMBANGUNAN FASA 3 YANG MENGADUNGI:- 1) SATU (1) BLOK PEJABAT 36 TINGKAT DI ATAS 5 TINGKAT PODIUM “RETAIL”/KOMERSIAL DAN 6 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH DI ATAS LOT 81 (P.T 15), SEKSYEN 95A, MUKIM KUALA LUMPUR, BANDAR MID VALLEY, JALAN SYED PUTRA DALAM BANDARAYA KUALA LUMPUR UNTUK TENTUAN MID VALLEY CITY DEVELOMENTS SDN. BHD.


Foundation Sub Con - Geopancar Sdn. Bhd.
Project Manager: Mr. C. K. Wong

Scope of Land Surveying works - Setting out Diaphragm wall & Barrete Piles. As-built Service pile & Cable

In this project, the difficulties in construction is unknown service pipe and cable across on site as the mid valley shopping mall just step away. Surveyor need to take the as-built for those pile line and cable so that can come out a new design of diaphragm wall in order to avoid those service pipe and cable.