PROJECT TITLE: CADANGAN PEMBANGUNAN FASA 3 YANG MENGADUNGI:- 1) SATU (1) BLOK PEJABAT 36 TINGKAT DI ATAS 5 TINGKAT PODIUM “RETAIL”/KOMERSIAL DAN 6 TINGKAT TEMPAT LETAK KERETA BAWAH TANAH DI ATAS LOT 81 (P.T 15), SEKSYEN 95A, MUKIM KUALA LUMPUR, BANDAR MID VALLEY, JALAN SYED PUTRA DALAM BANDARAYA KUALA LUMPUR UNTUK TENTUAN MID VALLEY CITY DEVELOMENTS SDN. BHD.
Foundation Sub Con - Geopancar Sdn. Bhd.
Project Manager: Mr. C. K. Wong
Scope of Land Surveying works - Setting out Diaphragm wall & Barrete Piles. As-built Service pile & Cable
In this project, the difficulties in construction is unknown service pipe and cable across on site as the mid valley shopping mall just step away. Surveyor need to take the as-built for those pile line and cable so that can come out a new design of diaphragm wall in order to avoid those service pipe and cable.